• Joshua Duvall

GAO: Protest Timeliness for Postponed Pre-Award Debriefings (Competitive Range Exclusion)

GAO decision highlights protest timeliness for postponed pre-award debriefings (competitive range exclusion).


GAO's timeliness rules are strictly construed and provide that a protest following a "required" post-award debrief is timely if it's filed not later than 10 days after the debriefing. 4 CFR § 21.2(a)(2). Where an offeror is excluded from competitive range, a pre-award debriefing that is postponed until after award is "required" only when the "[excluded] offeror requested and was refused a pre-award debriefing.” 41 USC § 3705(c). Where the contractor elects to postpone, however, the debrief after the award is not "required."


Here, the protester initially requested a pre-award debriefing. But, in response to an agency inquiry, the protester then decided to postpone. As a result, the debrief after the award was not "required." Ultimately, GAO dismissed the protest as untimely because the protester would have learned the basis of its protest had it requested a pre-award debrief (failure to diligently pursue).


Takeaway


If you are excluded from competitive range, request a pre-award debriefing and take the first date offered. Do not postpone. If you do, you may lose the ability to protest.


GAO Decision: https://www.gao.gov/products/B-417431#mt=e-report 


. . .


#GovCon #bidprotest


Recent Posts

See All

Debriefing and Bid Protest Tipsheet

The end of FY20 is around the corner, which means countless government contractors have recently received an award decision (or are patiently waiting for an award decision) from a federal agency. It a

MATROSS EDWARDS

Trusted Relationship.

Trusted Resource.

Washington, DC

Florida

© 2020 Matross Edwards LLC. All rights reserved. Attorney Advertising.

  • LinkedIn
  • Twitter
  • Podcast
  • gcj_box
  • cj_box
Matross Edwards - Logo.png